SWH civil case studies
Friday, 20 May 2011 14:32

River Walkham Boardwalk and Magpie Viaduct (Structures)

 

Magpie_ViaductThe scheme involved four distinct elements, all of which acted as preliminary works to a timber foot/cycle bridge across the Walkham Valley.

 

This bridge reconnected the old Plymouth to Tavistock railway track at a location one mile north of the Magpie Viaduct, which SWH has recently refurbished. This scheme was completed for Devon County Council.

 
Friday, 20 May 2011 14:27

Miller’s Crossing, Exeter (Structures)

 

Millers_CrossingThis 45m long slender steel deck crosses the River Exe in Exeter, allowing pedestrians and cyclists to cross with plenty of space.

 

The deck is supported by McAlloy tie bars running up to a vertical A frame then onto raking A frames with the tie bars being held down with a 50tonne counter weight in the form of a millstone. The A frame stays are on the west bank of the river, between the river and the mill leat. Access was a major factor in erecting the masts and deck section.

 
Friday, 20 May 2011 14:12

White Rock Business Park (Roads)

 

White_Rock_Business_ParkThe works involved the construction of a 600m long spine road into the development, two new roundabouts (one constructed on Long Road), a 7,600m2 modular attenuation tank (the largest of its type in the UK) and associated works.

 

Torbay Council, the South West Regional Development Agency and Abacus entered into an agreement to develop an area of land at Long Road in Paignton into a high-specification business park.

 

 
Friday, 20 May 2011 13:46

Sandygate Roundabout, Exeter (Roads)

 

SWH began works to re-align the central island to Sandygate Roundabout at Junction 30 of the M5 in the spring of 2008.

 

The works involved widening the carriageway either side of the motorway over bridge and included clearance of wooded areas and major re-grading of embankments.

 
Friday, 20 May 2011 12:49

Torre Abbey Sands, Phase 3 (Marine)

 

Between October 2009 and March 2010, SWH carried out refurbishment works to a 100m section of promenade and steps on Torquay seafront.

 

The works comprised the cleaning of algae from the existing concrete, scabbling all existing surfaces and installation of dowels, prior to overlaying the existing concrete with 120mm of new fibre reinforced concrete.

 

 