Shaldon Bridge, Teignmouth (Structures)

 

Shaldon_Bridge_TeignmouthThis contract involved the renewal of Shaldon Bridge (which connects Teignmouth and Shaldon over the River Teign).


It also included demolishing the existing footways and construction of new steel columns.

 

 
Thursday, 19 May 2011 15:31

Goodrington Sea Wall (Marine)

 

Goodrington_Sea_WallThis project involved the construction of a new 400 Cu.m reinforced concrete foundation, tied into the existing structure, and protected by a new sheet piled cut off wall.

 

Between November 2006 and March 2007 SWH carried out repairs and enhancements to the sea wall at Goodrington. The existing 370m long wall was predominantly of masonry construction, supported on a shallow reinforced concrete foundation, protected by a sheet piled cut off wall. As a result of lengthy exposure to the elements, much of the foundation was failing, resulting in the wall beginning to move in places.

 

 
Tuesday, 10 May 2011 06:24

Haldon Chalets Improvements (Roads and Structures)

 

This complex multi-disciplinary scheme involved the closure of an at-grade crossing on the A380 and the construction of a new intersection, an overbridge and 1km of associated side roads.

 

All the works were carried out within a SSSI.

 

A specialist was employed on the site for three months during the construction process to provide ecological supervision relating to protected species including reptiles, badgers and breeding birds.

 
Tuesday, 10 May 2011 06:22

Old Exeter Road, Kingsteignton (Roads)

 

The works provide highway and junction improvements to facilitate the future development of approximately 600 housing units.

 

They briefly comprise of the widening of just under 1km of existing carriageway, construction of a new traffic signal controlled T-junction, 150m of new carriageway, and junction improvements to an existing roundabout to change into a 4 way signal controlled junction with dedicated filter lanes.

 