Case studies

 

Read SWH Civil Engineering case studies here

 

Read SWH Build case studies here

 

Featured Case Study - River Walkman Broadwalk

 

Culm_River_Hemyock_Bridge_thumb100_100This project, for Hemyock Parish Council, involved the construction of a raised wooden footway, which ran along the roads edge situated on a flood plain within the village of Hemyock.

 

The footway consisted of concrete bases with timber posts attached. The footway was then able to hang from each of these timer posts.

 